Upcoming Projects
144 & 148 Joel
Site Preparation
Lot Benching
Fort Worth Dirtwerx benching 144 & 148 Joel. A good lot bench sets the stage for a great foundation.
Foundaiton
A highly skilled grade crew digs the foundation following the specs from the engineer.
Setting Forms
Luis Concrete setting forms at 144 & 148 Joel. Forms must be set with precision to meet the specifications of the lot the and house plans.
Slab Pouring
Slab is poured to create a smooth and even base.
Plumbing Rough
Tim Long plumbing digging and laying pipe. The plumbing rough must be done precisely to ensure pipes are in the right locations and inside walls.
Framing
After the foundation is perfected by our crews, framing begins.