Upcoming Projects

144 & 148 Joel

Site Preparation 

1000015513_edited.jpg

Lot Benching

Fort Worth Dirtwerx benching 144 & 148 Joel.  A good lot bench sets the stage for a great foundation. 

1000015925.jpg

Foundaiton

A highly skilled grade crew digs the foundation following the specs from the engineer.

1000015610.jpg

Setting Forms

Luis Concrete setting forms at 144 & 148 Joel. Forms must be set with precision to meet the specifications of the lot the and house plans. 

1000015966.jpg

Slab Pouring

Slab is poured to create a smooth and even base. 

1000015720.jpg

Plumbing Rough

Tim Long plumbing digging and laying pipe. The plumbing rough must be done precisely to ensure pipes are in the right locations and inside walls.  

1000016076.jpg

Framing

After the foundation is perfected by our crews, framing begins. 