Upcoming Projects

144 & 148 Joel

1000015513.jpg

Site Preparation: Lot Benching 

Fort Worth Dirtwerx benching 144 & 148 Joel. 

A good lot bench sets the stage for a great foundation. 

1000015610.jpg

Setting Forms 

Luis Concrete setting forms at 144 & 148 Joel. Forms must be set with precision to meet the specifications of the lot the and house plans. 

1000015747.jpg

Plumbing Rough 

Tim Long plumbing digging and laying pipe. The plumbing rough must be done precisely to ensure pipes are in the right locations and inside walls.  